#502S&P 500 rank

FE — FirstEnergy Corp.

2-yr score: 31.8/100 (Bottom 10%)Utilities5d
$45.51−0.46%
Description

FirstEnergy Corp. is an American utility company that, through its subsidiaries, provides comprehensive electricity services, encompassing generation, transmission, and distribution throughout the United States. Its operations are structured into Regulated Distribution and Regulated Transmission segments.

Score breakdownLatest quarter27.3 · Poor
Growth
38.2
Quality / Profitability
48.9
Financial health
2.7
Ratio screener
17.4
Track record: 2-yr avg 31.8 (Weak, 8 quarters ≈ 2 yrs) · long-term avg 30.9 (Weak, 40 quarters ≈ 10 yrs) · next earnings Oct 27, 2026 (in 5 days)
Valuation context (informational only — not part of the score)
Neutral vs. its own history
Entry timing (informational only — not part of the score)
Neutral
Live market dataPrice updated Oct 21, 4:25 PM ET
P/E (TTM)
24.3
Yield
3.83%
RSI (14)
54.1
vs SMA20
+2.30%
vs SMA50
-0.03%
vs SMA200
-4.11%
Analyst target
$49
+8.4%
3 analysts
AI theoretical price
$47
+3.8%
as of 2026-09-13

Price chart & technical analysis

Loading chart…

AI deep-dive analysisAnalysis as of 2026-09-13 - price/technical figures below reflect that date, not live market data

As of 2026-09-13, FirstEnergy trades at $46.12 after a -9.83% six-month slide, sitting below its 20-, 50- and 200-day moving averages with RSI at 41.4. It carries a 3.83% dividend yield and trades at 16.9x FY27 consensus EPS of $2.73, but trailing GAAP figures are muddied by a Q4 2025 one-off loss and free cash flow has been negative in seven of the last eight quarters.

AI sentimentNeutral

The tape and the fundamental narrative are pulling in opposite directions, which nets out to genuinely neutral sentiment as of 2026-09-13. The price action is soft: FE has fallen 9.83% over six months, 1.91% over three months and 1.37% over the last week, and at $46.12 sits roughly 11.9% below its 52-week high of $52.34 (though still 7.3% above the $43 low). Analyst tone is more constructive than the tape - 12 Buy vs. 16 Hold and zero Sell ratings, a $52.80 consensus target, and Barclays ($54) / Morgan Stanley ($52) overweight stances - but the average rating is still only 'Hold,' and the July 28, 2026 Q2 print was a modest beat on revenue ($3.68B vs. $3.54B consensus) with EPS merely matching at $0.50. Data center contracting (25 GW pipeline, 6.4 GW contracted) and reaffirmed 2026 guidance of $2.62-$2.82 are real positives, but they are forward promises, not current cash, and the market is not paying up for them yet.

Quarterly trend

Revenue is genuinely accelerating, but cash generation is moving the other way - that split is the whole story. Quarterly revenue growth versus the year-ago quarter ran just +1.0% (Q4 2024), +6.9% (Q3 2024) and +3.0% (Q2 2025), then inflected hard: +11.2% (Q3 2025), +19.6% (Q4 2025), +11.6% (Q1 2026) and +8.8% (Q2 2026). TTM revenue through Q2 2026 is $15.83B vs. $14.05B a year earlier, +12.6%. Operating margin is stable, not improving: 18.4% in Q2 2026, 19.7% in Q1 2026, 20.0% in Q3 2025, 19.1% in Q2 2025 - all inside an 18-20% band, with Q4 2025 the clear outlier at 15.9% (gross profit of just $975M vs. ~$2.5B in adjacent quarters, a one-off charge). Earnings quality is where it breaks down: TTM operating income rose 7.2% ($2,938M vs. $2,740M), but TTM net income FELL 17% to $1,086M ($1,308M prior), because interest expense is compounding with the debt load - long-term debt went from $23.75B in Q2 2025 to $27.10B in Q2 2026, up $3.36B or 14% in twelve months, faster than operating income growth. And operating cash flow is shrinking: TTM OCF through Q2 2026 was $3,118M versus $3,538M a year earlier, down ~12%, while TTM capex hit $5,986M - so TTM free cash flow is roughly -$2.9B. Equity as a share of total assets slipped from 23.7% to 22.2% year over year. Revenue acceleration is real and structural (load growth plus rate increases); the cash-flow deterioration is also real and structural (capex cycle plus leverage), and it is the more important of the two right now.

Valuation assessment

Fair, and I would not call it cheap. As of 2026-09-13 the headline P/E of 24.6x on trailing GAAP EPS of $1.879 looks expensive, but it is distorted - that TTM figure includes the -$0.085 Q4 2025 GAAP quarter. On the company's own FY26 core guidance midpoint of $2.72 the stock is 17.0x, and on FY27 consensus EPS of $2.73 it is 16.9x, which is squarely mid-range for regulated electrics (D, DUK, AEP, EXC, ED generally trade in the mid-to-high teens forward). The 5-year average P/E of 28.91 is not a usable anchor because it is built on the same depressed-GAAP base and on years when FE earned far less; the more relevant own-history datapoint is P/S of 1.686 versus a 5-year average of 1.80, i.e. slightly below its own norm. Price-to-book of 2.06x against a reported ROE of only 8.2% is the least flattering metric in the set - a utility earning below its authorized returns rarely deserves a premium book multiple. The 3.83% dividend yield is above the peer average and provides real support. Net: fair value, with a mild valuation cushion from the yield and P/S, and no discount to speak of on earnings.

Price vs. earnings playbook

The market is pricing FE as an ordinary regulated utility, not as a data center growth story, and both the bull and bear cases run through that gap. At 16.9x forward earnings the stock embeds perhaps 5-6% normalized EPS growth and nothing for the 25 GW demand pipeline - only 6.4 GW of which is actually contracted, so the market's skepticism is rational rather than lazy. The other side of the ledger is that the reaffirmed FY26 core range of $2.62-$2.82 requires roughly $1.42-$1.62 of EPS in H2 2026 against just $1.20 booked in H1, so the year is heavily back-half weighted and one mild summer or an outage-slippage issue puts the low end at risk. Q2 made the tension explicit: revenue beat by ~$140M but EPS only matched at $0.50, meaning cost and financing pressure absorbed the upside. Practically: an earnings beat that comes with a negatively revised financing plan or an equity issuance would likely be punished, while a contract announcement converting more of the 25 GW pipeline into signed load would be the cleanest re-rating catalyst. Do not pay for the pipeline until it shows up in rate base and contracted backlog.

Technical picture

Range-bound with a downward bias as of 2026-09-13, not oversold. RSI(14) at 41.37 is weak-neutral - there is room to fall into the 30s before any textbook bounce signal appears. Price is -0.98% vs. the 20-day (~$46.6), -3.15% vs. the 50-day (~$47.6) and -2.94% vs. the 200-day (~$47.5), so the 50- and 200-day have converged around $47.5-$47.6 and now form a single overhead wall. The stock is grinding, not crashing: -1.37% over one week, -1.87% over one month, -1.91% over three months, -9.83% over six months. Trading implication: nothing here forces urgency. A buyer gets either a defined-risk entry near the 52-week low at $43 (though that would imply -7% from here and likely a worsening fundamental narrative), or confirmation via a reclaim of the $47.5-$47.6 cluster, which would also put the stock back above all three averages. Chasing between $46 and $47.5 is the worst of both.

Macro factors
  • Interest rates and the cost of capital - with $27.10B of long-term debt (up $3.36B year over year), a $36B 'Energize365' capex program and a ~3.8% yield that competes directly with fixed income, FE's multiple and its financing costs both move with the rate curve; every 50bp of funding cost on the incremental debt is a direct hit to EPS.
  • AI/data center electricity demand - the 25 GW regional pipeline (6.4 GW contracted) and a 16% transmission rate-base growth target through 2030 are genuine structural tailwinds concentrated in West Virginia and Ohio, but hyperscaler capex is pro-cyclical and only a minority of the pipeline is signed.
  • State and federal regulatory environment - PUC rate decisions on authorized ROE and cost recovery (including the September 2026 Potomac Edison $52.8M Maryland filing and pending Ohio/New Jersey/PA distribution cases) determine whether the capex converts into earnings or into disallowed costs.
  • Political/credibility overhang - FE is still rebuilding institutional trust after the HB6 scandal, which shows up as a persistent valuation discount to higher-quality regulated peers and as heightened scrutiny in rate proceedings.
  • Defensive sector rotation and low beta - at a beta of 0.441, FE tends to lag in risk-on markets and attract flows when growth scares hit; this is a diversifier, not a momentum vehicle.
Key catalysts
  • Q3 2026 results (expected late October/early November 2026) - the single biggest near-term proof point, since FY26 guidance requires roughly $1.42-$1.62 of EPS in H2 versus $1.20 in H1, plus an updated read on contracted data center capacity and capital deployment.
  • Maryland PSC ruling on Potomac Edison's $52.8M rate adjustment, plus Ohio, New Jersey and Pennsylvania distribution filings - outcomes on authorized ROE and cost recovery directly set the earnings trajectory of the capex plan.
  • Additional data center contracts converting the 25 GW pipeline beyond the 6.4 GW already signed, and progress on the 1.2 GW Moundsville Energy Center in West Virginia and the proposed generation-co model.
  • Interest rate path - a sustained decline in long rates would ease the financing burden on the debt-funded capex program and mechanically support utility multiples.
  • Negotiated equity or hybrid issuance to pre-fund Energize365 - a catalyst either way, since it removes balance-sheet risk but dilutes per-share earnings.
Key risks
  • Balance sheet and financing strain: debt-to-equity of 2.241, a current ratio of 0.541, only $63M of cash on hand, and TTM free cash flow of roughly -$2.9B against a ~$6B 2026 capex program - the company must continuously raise debt and equity into whatever market it finds.
  • Regulatory and rate-case risk: authorized ROE outcomes (and any disallowances) in Maryland, Ohio, Pennsylvania and New Jersey, compounded by residual credibility damage from the HB6 scandal, could cap the returns on $36B of planned capital spending.
  • GAAP earnings quality: the Q4 2025 quarter produced a net loss of -$49M (-$0.085 per share) with gross profit of only $975M versus roughly $2.5B in adjacent quarters - if that caliber of one-off recurs, the dividend payout ratio on a GAAP basis becomes uncomfortable and the stock re-rates lower.
  • Back-half-weighted guidance risk: FY26 core guidance of $2.62-$2.82 requires a sizable H2 step-up, leaving little slack for milder weather, higher storm/outage costs or interest expense running ahead of plan.
  • Data center pipeline execution risk: only 6.4 GW of the 25 GW pipeline is contracted, so a slowdown in hyperscaler spending would leave FE carrying the fixed costs of a capex and financing plan built for load growth that never materialized.
  • Dividend coverage: at ~$1.77 per share annually, the dividend consumes roughly 65% of core EPS while free cash flow is deeply negative, meaning the payout is being funded partly with borrowed money.
Investment thesis

Not a buy at 2026-09-13 levels, and not a short either. FirstEnergy is a slow-growth, capital-devouring regulated utility trading at roughly fair value - 16.9x forward core earnings and a 3.83% yield against a $47.23 fair-value estimate, or about 2.4% upside - which means you are being paid a low double-digit total return at best for real regulatory, financing and execution risk. The data center demand story is legitimate (25 GW pipeline, 6.4 GW contracted) and the 6-8% EPS growth target through 2030 is credible, but revenue is growing faster than net income (TTM revenue +12.6%, TTM net income -17%) because rising interest on $27.10B of long-term debt plus a $6B annual capex program is eating the improvement, and the tape (-9.8% over six months, below all key moving averages) is telling you the market has noticed. Wait for either a pullback toward the $43 area where the yield does more work, or evidence in the Q3 print that H2 guidance is being delivered and the data center pipeline is converting to contracted backlog.

AI theoretical price methodology

Forward P/E on FY27 consensus EPS of $2.73, applying a 17.3x multiple - roughly the regulated electric peer median of ~17-18x forward, held slightly below it to reflect FE's below-peer reported ROE of 8.2%, its $27.10B debt load and residual regulatory/credibility overhang, while granting partial credit for the 16% transmission rate-base growth target and the 25 GW data center pipeline. 2.73 x 17.3 = $47.23, which cross-checks against an EV/EBITDA approach (EV of ~$53.7B at the market's 11.9x on ~$4.51B EBITDA; at 12.0x that implies ~$46.9 per share) and sits well below the $52.80 analyst consensus, which would require a 19.3x multiple this business has not earned.

AI lean: BearishConfidence: Medium
AI review of the deterministic score
Partially Agree

The deterministic score of 27.3 ('Poor Fundamentals') is directionally defensible but structurally harsh on a regulated utility, and I would rate it roughly 10-15 points higher, around 40 (a 'Weak' rather than 'Poor' read). The reason is that the two pillars dragging it down are sector artifacts rather than distress signals: financial_health scored 2.7 on a 2.241 debt-to-equity, 0.541 current ratio and negative free cash flow, and the ratio screener scored 17.4 essentially because FE looks terrible measured against the full S&P 500 2015-2025 population on quick ratio (0.446), current ratio, P/B (2.06) and price-to-cash (423.9). Regulated electrics deliberately run working-capital deficits, fund capex with debt, and post negative FCF throughout a build-out cycle - this is the normal shape of the business model, not a warning of insolvency, and the score has no way to know that. Meanwhile the genuinely positive signals the formula does compute are respectable: the accruals ratio of -1.2% as of 2026-06-30 (cash earnings running ahead of reported net income) and a quality/profitability score of 48.9. I also note the trailing figures are polluted by the Q4 2025 one-off (net loss of -$49M, gross profit of $975M versus ~$2.5B in neighboring quarters), which depresses TTM GAAP EPS to $1.879 against core guidance of $2.62-$2.82 and inflates the trailing P/E to 24.6x. Importantly, the cyclical-trough carve-out does NOT apply here: this is not a commodity or semiconductor name at the bottom of a cycle with margins about to snap back - it is a utility whose low score comes from capital structure and a deliberate capex ramp, which is persistent, not temporary. My upward adjustment lands in the 'Weak' band, one tier above 'Poor,' and does not change the mandatory band/valuation mapping. Note also that my independent fair value of $47.23 sits only ~2.4% above the 2026-09-13 price of $46.12, so the bearish posture below is a rules-derived weighting against a company already priced close to fairly, not a call that the stock is badly overvalued.

AI-generated analysis for informational purposes only, not financial advice.